Project |
|
Project Name |
|
Project Manager |
|
Phone |
|
|
|
|
|
|
|
|
 |
| |
|
Byers Hall |
|
|
 |
| |
|
M0422 |
|
MB24C, QB3 - INST. BIOENG., BIOTECH. & QUANTITATIVE BIOMEDICAL RSRCH |
|
SANDRA BECK |
|
476-0962 |
|
|
|
|
|
|
|
|
| |
|
M4417 |
|
MB BLDG 24C QB3 EQUIPMENT |
|
TOM HOCHMUTH |
|
476-6945 |
|
|
|
|
|
|
|
|
| |
|
M4417A |
|
MB BLDG 24C QB3 USER MODIFICATIONS / GROUP 2 & 3 BUDGET |
|
TOM HOCHMUTH |
|
476-6945 |
|
|
|
|
|
|
|
|
| |
|
M4418 |
|
MB BLDG 24C QB3 RELOCATION |
|
TOM HOCHMUTH |
|
476-6945 |
|
|
|
|
|
|
|
|
| |
|
Central Plant |
|
|
 |
| |
|
M5404 |
|
PCUP SCADA/DCS SYSTEM UPGRADE TO OVATION |
|
PETER SPADIA |
|
514-2771 |
|
|
|
|
|
|
|
|
| |
|
M8405 |
|
PCUP NITROUS OXIDE EMISSION CONTROL SYSTEM CONVERSION |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
|
|
|
| |
|
Child C Ctr |
|
|
 |
| |
|
M7446 |
|
KIRKHAM CHILDCARE PLAY YARD EXTENSION |
|
CRAIG PETERSON |
|
415-476-3943 |
|
|
|
|
|
|
|
|
| |
|
M7451 |
|
LUCIA CHILD CARE CENTER RENOVATION |
|
CRAIG PETERSON |
|
415-476-3943 |
|
|
|
|
|
|
|
|
| |
|
Clinical Sci |
|
|
 |
| |
|
M5436 |
|
CSB ROOMS 450 & 455 DEPT OF ANESTHESIA OFFICE RENOVATION |
|
GARY NELSON |
|
476-6829 |
|
|
|
|
|
|
|
|
| |
|
M6431 |
|
CSB ROOM 251 & 259 OFFICE RENOVATION |
|
GARY NELSON |
|
476-6829 |
|
|
|
|
|
|
|
|
| |
|
M6447 |
|
CSB 2ND FLOOR C220 S/N OFFICE RENEWAL |
|
DIANE MCGEE |
|
476-4754 |
|
|
|
|
|
|
|
|
| |
|
M7404 |
|
CSB SEISMIC INTERIM MITIGATION STUDY, PHASE 1 - CONCEPTUAL DESIGN/ESTIMATE |
|
MIKE TOPORKOFF |
|
502-0871 |
|
|
|
|
|
|
|
|
| |
|
M7422 |
|
CSB ROOM C-319 LAB RENOVATION |
|
DIANE MCGEE |
|
476-4754 |
|
|
|
|
|
|
|
|
| |
|
M7433 |
|
CSB/MSB S-701 & C-544-CONVERT 2 COLD ROOMS INTO AN OFFICE AND LAB |
|
DIANE MCGEE |
|
476-4754 |
|
|
|
|
|
|
|
|
| |
|
M7452 |
|
CSB 200, S/M OFFICE OF ADMISSIONS FULL SUITE RENOVATION |
|
Julie Gallivan |
|
476-2080 |
|
|
|
|
|
|
|
|
| |
|
M7458 |
|
CSB ROOM C327 & C329 RENOVATION |
|
DIANE MCGEE |
|
476-4754 |
|
|
|
|
|
|
|
|
| |
|
M8407 |
|
CSB ROOM 628G PERIODONTOLOGY OFFICE SEPARATION |
|
Julie Gallivan |
|
476-2080 |
|
|
|
|
|
|
|
|
| |
|
Com Ctr Parking |
|
|
 |
| |
|
M7408 |
|
MISSION BAY 21A PARKING STRUCTURE - BANNERS |
|
EILEEN JUE |
|
502-7263 |
|
|
|
|
|
|
|
|
| |
|
Community Center |
|
|
 |
| |
|
M5460 |
|
MB BLDG 21 COMMUNITY CENTER EASTSIDE DRAINAGE AND WATERPROOFING |
|
CRAIG PETERSON |
|
415-476-3943 |
|
|
|
|
|
|
|
|
| |
|
M6455 |
|
MISSION BAY COMMUNITY CENTER LEGORRETTA ITEMS |
|
LUANNE MULLIN |
|
514-1426 |
|
|
|
|
|
|
|
|
| |
|
Dentistry |
|
|
 |
| |
|
M7456 |
|
DENTAL CLINIC-SUITE D1050 REMODEL PHASE 2 |
|
PATRICK MCGEE |
|
502-6058 |
|
|
|
|
|
|
|
|
| |
|
M7464 |
|
SOD D4203 DENTAL LAB RENOVATION |
|
PATRICK MCGEE |
|
502-6058 |
|
|
|
|
|
|
|
|
| |
|
Fresno MERC |
|
|
 |
| |
|
M6422 |
|
UCSF FRESNO MEDICAL EDUCATION AND RSRCH CENTER, 2ND FLOOR S/M SHELL SPACE |
|
SUSAN SIMPSON |
|
476-5391 |
|
|
|
|
|
|
|
|
| |
|
M6438 |
|
UCSF FRESNO MEDICAL EDUCATION AND RSRCH CTR, 2ND FLOOR PHARMACY SHELL SPACE |
|
SUSAN SIMPSON |
|
476-5391 |
|
|
|
|
|
|
|
|
| |
|
Genentech Hall |
|
|
 |
| |
|
M3434 |
|
MB BLDG 24 GENENTECH HALL DI WATER SYSTEM IMPROVEMENTS |
|
PETER SPADIA |
|
514-2771 |
|
|
|
|
|
|
|
|
| |
|
M4480 |
|
MISSION BAY BLDG 24 GENENTECH HALL STEAM BOILER RETROFIT |
|
PETER SPADIA |
|
514-2771 |
|
|
|
|
|
|
|
|
| |
|
M6448 |
|
MB GENENTECH HALL ROOM N114 - EOC CONVERSION STUDY |
|
EILEEN JUE |
|
502-7263 |
|
|
|
|
|
|
|
|
| |
|
HSIR East |
|
|
 |
| |
|
M3437 |
|
HSE 6TH FLOOR S/M, ORTHOPAEDIC SURGERY LAB RENOVATION |
|
LUANNE MULLIN |
|
514-1426 |
|
|
|
|
|
|
|
|
| |
|
M5417 |
|
HSE 5 CENTER FOR BIOENGINEERING AND TISSUE REGENERATION |
|
Patti Mitchell |
|
514-4337 |
|
|
|
|
|
|
|
|
| |
|
M6424 |
|
HSE HIGH VOLTAGE SWITCHGEAR REPLACEMENT |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
|
|
|
| |
|
M6439 |
|
HSE 16TH FLOOR ROOM 1661-1679 S/M LABORATORY RENOVATION |
|
Patti Mitchell |
|
514-4337 |
|
|
|
|
|
|
|
|
| |
|
M6463 |
|
HSE 15TH S/D CRANIOFACIAL & MESENCHYMAL BIOLOGY PROGRAM LABORATORIES - DEMO |
|
PATRICK MCGEE |
|
502-6058 |
|
|
|
|
|
|
|
|
| |
|
M6466 |
|
HSE FUME HOOD FAN ENCLOSURE FAILURE |
|
MIKE TOPORKOFF |
|
502-0871 |
|
|
|
|
|
|
|
|
| |
|
M7401 |
|
HSE 15 S/D CRANIOFACIAL & MESENCHYMAL BIOLOGY PROGRAM LAB RENOVATION |
|
PATRICK MCGEE |
|
502-6058 |
|
|
|
|
|
|
|
|
| |
|
M7424 |
|
HSE 4TH FLOOR ROOMS 447-448 S/M REMODEL |
|
TOM HOCHMUTH |
|
476-6945 |
|
|
|
|
|
|
|
|
| |
|
HSIR West |
|
|
 |
| |
|
M0435 |
|
HSW IMPROVEMENTS PHASE 1 |
|
MIKE TOPORKOFF |
|
502-0871 |
|
|
|
|
|
|
|
|
| |
|
M5435 |
|
HSIR TOWERS ROOF REPLACEMENT |
|
MIKE TOPORKOFF |
|
502-0871 |
|
|
|
|
|
|
|
|
| |
|
M5469 |
|
HSW 4TH FLOOR PATHOLOGY LAB RENOVATION |
|
MIKE TOPORKOFF |
|
502-0871 |
|
|
|
|
|
|
|
|
| |
|
M5470 |
|
HSW 14TH FLOOR DEPT OF OB/GYN LAB RENOVATION |
|
LUANNE MULLIN |
|
514-1426 |
|
|
|
|
|
|
|
|
| |
|
Laurel Hts |
|
|
 |
| |
|
M4414 |
|
LAUREL HEIGHTS WINDOW LEDGE RENEWAL PHASE 1 |
|
DON SZETO |
|
476-8071 |
|
|
|
|
|
|
|
|
| |
|
M5433 |
|
LAUREL HEIGHTS, SUITE 430, ROOM 435H SERVER ROOM COOLING SYSTEM |
|
PATRICK MCGEE |
|
502-6058 |
|
|
|
|
|
|
|
|
| |
|
M6414 |
|
LAUREL HEIGHTS 2ND FLOOR, ROOM 2T3 & 2T4 ADA COMPLIANCE REMODEL |
|
MIKE TOPORKOFF |
|
502-0871 |
|
|
|
|
|
|
|
|
| |
|
M8406 |
|
LAUREL HTS, 102F-SERVER HVAC |
|
DENISE STRIPLING |
|
476-3578 |
|
|
|
|
|
|
|
|
| |
|
Library |
|
|
 |
| |
|
M7415 |
|
DEFERRED MAINT 06-07, BP 6 - KALMANOVITZ LIBRARY ELEVATOR CONTROLS RENEWAL |
|
LUANNE MULLIN |
|
514-1426 |
|
|
|
|
|
|
|
|
| |
|
M7417 |
|
KALMANOVITZ LIBRARY ENERGY MANAGEMENT AND CONTROL SYSTEM (EMCS) REPLACEMENT |
|
SUSAN SIMPSON |
|
476-5391 |
|
|
|
|
|
|
|
|
| |
|
M7490 |
|
CAMPUS LIBRARY TELEMED ADA ACCESS IMPROVEMENTS |
|
Patti Mitchell |
|
514-4337 |
|
|
|
|
|
|
|
|
| |
|
LPPI |
|
|
 |
| |
|
M7423 |
|
LPPI ANNEX ROOF REPAIRS |
|
MIKE TOPORKOFF |
|
502-0871 |
|
|
|
|
|
|
|
|
| |
|
MB Parking |
|
|
 |
| |
|
M2426 |
|
MB BLDG. 23B PARKING STRUCTURE |
|
EILEEN JUE |
|
502-7263 |
|
|
|
|
|
|
|
|
| |
|
M5462 |
|
MBAY 23B POLICE SUB-STATION |
|
EILEEN JUE |
|
502-7263 |
|
|
|
|
|
|
|
|
| |
|
M6405 |
|
MISSION BAY CAMPUS - PHOTOVOLTAIC SYSTEM |
|
EILEEN JUE |
|
502-7263 |
|
|
|
|
|
|
|
|
| |
|
M7407 |
|
MB BLDG 23B PUBLIC RESTROOMS |
|
EILEEN JUE |
|
502-7263 |
|
|
|
|
|
|
|
|
| |
|
Med Res 4 |
|
|
 |
| |
|
M7431 |
|
MR4 DEPT OF PEDIATRICS COSMETIC UPGRADES - PHASE 2 |
|
TOM HOCHMUTH |
|
476-6945 |
|
|
|
|
|
|
|
|
| |
|
Med Sciences |
|
|
 |
| |
|
M2444 |
|
MSB IMPROVEMENTS PHASE 2 |
|
SUSAN SIMPSON |
|
476-5391 |
|
|
|
|
|
|
|
|
| |
|
M4401 |
|
MSB S-115 OFFICE REMODEL |
|
EILEEN JUE |
|
502-7263 |
|
|
|
|
|
|
|
|
| |
|
M6428 |
|
MSB 13TH FLR, S1372 ANATOMY DEPT RENOVATION |
|
LUANNE MULLIN |
|
514-1426 |
|
|
|
|
|
|
|
|
| |
|
M6462 |
|
MSB 11TH FLR S/M ORTHO SURGERY LAB/OFFICE RENOVATION |
|
LUANNE MULLIN |
|
514-1426 |
|
|
|
|
|
|
|
|
| |
|
M6464 |
|
MSB 5TH FLOOR S/M LAB MED RENOVATION |
|
LUANNE MULLIN |
|
514-1426 |
|
|
|
|
|
|
|
|
| |
|
M7410B |
|
MSB CHILLER LOOP BYPASS PIPING RENEWAL |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
|
|
|
| |
|
M7438 |
|
MSB - LARC ANIMAL CAGE WASHROOM REHABILITATION |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
|
|
|
| |
|
M7445 |
|
MSB IMPROVEMENTS PHASE 3 |
|
SUSAN SIMPSON |
|
476-5391 |
|
|
|
|
|
|
|
|
| |
|
M7447 |
|
STUDY - MSB IMPROVEMENTS PHASE 3 |
|
SUSAN SIMPSON |
|
476-5391 |
|
|
|
|
|
|
|
|
| |
|
M8402 |
|
DAMAGED CORRIDOR STUDY |
|
DENNIS TUBERTY |
|
514-2526 |
|
|
|
|
|
|
|
|
| |
|
Millberry |
|
|
 |
| |
|
M6430 |
|
MU WEST 3RD FLOOR ORTHOPAEDIC SURGERY OFFICE RENOVATION |
|
LUANNE MULLIN |
|
514-1426 |
|
|
|
|
|
|
|
|
| |
|
M7410D |
|
MU H-LEVEL DETERIORATED WATER PIPING REPLACEMENT |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
|
|
|
| |
|
M8404 |
|
MUW 200 SAA REMODEL AND STAFF RELOCATION |
|
GARY NELSON |
|
476-6829 |
|
|
|
|
|
|
|
|
| |
|
Mission Ctr |
|
|
 |
| |
|
M6437 |
|
MCB LOBBY UPGRADES |
|
GARY NELSON |
|
476-6829 |
|
|
|
|
|
|
|
|
| |
|
M6456 |
|
UCPD EOC CLOSET CONSTRUCTION, MCB ROOMS 126-128 |
|
PATRICK MCGEE |
|
502-6058 |
|
|
|
|
|
|
|
|
| |
|
M7413B |
|
MCB CHILLER UNIT CONDENSING COIL REPLACEMENT |
|
PATRICK MCGEE |
|
502-6058 |
|
|
|
|
|
|
|
|
| |
|
M7414A |
|
MCB DEAERATOR (DA) TANK AND PIPING REPLACEMENT |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
|
|
|
| |
|
M7416A |
|
MCB FAN AND MOTOR REPLACEMENT |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
|
|
|
| |
|
M7416B |
|
MCB EMERGENCY POWER TRANSFER SWITCH RENEWAL |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
|
|
|
| |
|
M8403 |
|
MCB 3RD FLOOR OAAIS & STUDENT ACCOUNTS |
|
DON SZETO |
|
476-8071 |
|
|
|
|
|
|
|
|
| |
|
Moffitt Hosp |
|
|
 |
| |
|
M3451 |
|
MOFFITT 13TH FLOOR WEST, CVRI REMODEL |
|
Patti Mitchell |
|
514-4337 |
|
|
|
|
|
|
|
|
| |
|
M7435 |
|
MOFFITT- MSB ACCESS CONTROL |
|
Patti Mitchell |
|
514-4337 |
|
|
|
|
|
|
|
|
| |
|
MtZ Bldg C |
|
|
 |
| |
|
M7426 |
|
MT. ZION SIMULATION CENTER |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
|
|
|
| |
|
MtZ Cancer Res |
|
|
 |
| |
|
M3452 |
|
MT. ZION WATER INFILTRATION STUDY |
|
KEVIN AUSTIN |
|
476-2873 |
|
|
|
|
|
|
|
|
| |
|
M6457 |
|
MT ZION RC MONITORING BASED COMMISSIONING PROJECT |
|
PATRICK MCGEE |
|
502-6058 |
|
|
|
|
|
|
|
|
| |
|
M6461 |
|
MT ZION RC CONTROL SYSTEM UPGRADE |
|
PATRICK MCGEE |
|
502-6058 |
|
|
|
|
|
|
|
|
| |
|
SFGH Bldg 1 |
|
|
 |
| |
|
M7437 |
|
SFGH BUILDING 1 ADVANCED SEISMIC STUDY |
|
GARY NELSON |
|
476-6829 |
|
|
|
|
|
|
|
|
| |
|
SFGH Bldg 100 |
|
|
 |
| |
|
M7429 |
|
SFGH BUILDING 100 REPLACEMENT CONCEPTUAL DESIGN STUDY |
|
GARY NELSON |
|
476-6829 |
|
|
|
|
|
|
|
|
| |
|
SFGH Bldg 40 |
|
|
 |
| |
|
M7432 |
|
SFGH BUILDIN |