Project |
|
Project Name |
|
Project Manager |
|
Phone |
|
Start |
|
End |
|
% Complete |
|
|
 |
| |
|
MISSION BAY CAMPUS LANDSCAPE |
|
|
 |
| |
|
M1415 |
|
MISSION BAY ART IMPLEMENTATION PROJECT |
|
SANDRA BECK |
|
476-0962 |
|
|
|
|
|
0% |
|
|
| |
|
DESC: |
|
Art work for Mission Bay Campus. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M5421 |
|
MISSION BAY CIVIL MASTER PLAN STUDY |
|
SANDRA BECK |
|
476-0962 |
|
|
|
|
|
99% |
|
|
| |
|
DESC: |
|
Master Plan for Mission Bay Civil Engineering issues. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M5444 |
|
MISSION BAY CAMPUS 2ND MPOE/MDF (ENS) |
|
GARY NELSON |
|
476-6829 |
|
12/21/09 |
|
|
|
50% |
|
|
| |
|
DESC: |
|
Provide 2nd Major Point of Entry (MPOE) for Mission Bay Campus teldata loop and service providers. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M7419 |
|
MISSION BAY CENTRAL UTILITY PLANT PROGRAMMING STUDY |
|
SANDRA BECK |
|
476-0962 |
|
|
|
|
|
100% |
|
|
| |
|
DESC: |
|
Programming effort for the future Mission Bay Central Utilities Plant. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M7463 |
|
MISSION BAY 12KV AND IT DUCT BANK ON 13TH STREET (NELSON RISING LANE) |
|
SANDRA BECK |
|
476-0962 |
|
|
|
|
|
0% |
|
|
| |
|
DESC: |
|
Installation of the 12/ITS duct bank down 13th Street - duct bank is to provide pathway for future 12kv power circuits for the Mission Bay CUP, as well as, future telecom/data circuits from MPOE located in 17C. Project was installed with our finalized en |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|