Project |
|
Project Name |
|
Project Manager |
|
Phone |
|
Start |
|
End |
|
% Complete |
|
|
 |
| |
|
PARNASSUS SITE |
|
|
 |
| |
|
M3444A |
|
IRM GROUP 2 & 3 EQUIPMENT, FURNITURE AND RELOCATION |
|
MIKE TOPORKOFF |
|
502-0871 |
|
|
|
|
|
0% |
|
|
| |
|
DESC: |
|
Group 2/3 equipment, furniture for IRM project. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M6418 |
|
PARNASSUS UTILITIES MASTER PLAN |
|
DENISE STRIPLING |
|
476-3578 |
|
|
|
|
|
0% |
|
|
| |
|
DESC: |
|
A study of the existing Parnassus Utility Systems, followed by recommendations for future expansion and development. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M7402 |
|
TELEMEDICINE AND PRIME-US EDUCATION FACILITIES |
|
PATTI MITCHELL |
|
514-4337 |
|
|
|
|
|
0% |
|
|
| |
|
DESC: |
|
Provide Telemedicine and Prime-US Educational Facilities at Parnassus, SFGH, and City Clinics. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M7411B |
|
CSB 7TH FLOOR ELECTRICAL PANEL "B" AND FRP ROOFTOP PANEL REPLACEMENT |
|
JULIE GALLIVAN |
|
476-2080 |
|
12/01/08 |
|
|
|
99% |
|
|
| |
|
DESC: |
|
Replacement of the CSB 7th Floor Electrical Panel "B" and the FRP Rooftop Panel. Priority #7 on the 2006-2007 Deferred Maintenance List. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M7412B |
|
MSB FIRE ALARM SYSTEM RENEWAL |
|
FRANK FASANO |
|
476-8270 |
|
12/10/09 |
|
|
|
100% |
|
|
| |
|
DESC: |
|
Upgrading HSIR fire alrarm system: head-end and field panels; system renewal. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M7489 |
|
PARNASSUS CENTRAL RECEIVING AREA SECURITY GATE |
|
JULIE GALLIVAN |
|
476-2080 |
|
|
|
|
|
90% |
|
|
| |
|
DESC: |
|
Installation of a security access gate at the entrance of the Central Receiving Area. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M8450 |
|
PARNASSUS STAIRWELL LIGHT FIXTURE REPLACEMENT |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
95% |
|
|
| |
|
DESC: |
|
Replace stairwell fixtures (200) in Medical Sciences Building, Nursing Building, and the Dentistry Building. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|