UCSF home page UCSF home page About UCSF Search UCSF UCSF Medical Center Contact Us Search CPFM CPFM Staff Pages Jobs at CPFM
ucsf banner
cpfm logo contact bar
 Capital Projects 
    Project   Project Name   Project Manager   Phone   Start   End   % Complete    
     CENTRAL UTILITIES PLANT    
    M8405     PCUP AQUEOUS-AMMONIA CARRIER PIPE RENEWAL    DAN KRASNOW    476-6822             10%     
    DESC:   Replace existing aqueos-ammonia carrier pipe with new stainless steel piping and containment - storage facility to vaporizers.                       
    M8434     PCUP MODICON CONTROL SYSTEM REPLACEMENT    DENISE STRIPLING    476-3578             40%     
    DESC:   Replace the Modicon control system with Ovation Distribution Control System - Install conduit and pull control wire from each motor control center in the PCUP to a single centrally locatied cabinet, connect to existing Ovation dta control system, programm                       
    M9422     PCUP-FIRE ALARM REPLACEMENT    FRANK FASANO    476-8270             0%     
    DESC: