Project |
|
Project Name |
|
Project Manager |
|
Phone |
|
Start |
|
End |
|
% Complete |
|
|
 |
| |
|
CENTRAL UTILITIES PLANT |
|
|
 |
| |
|
M8405 |
|
PCUP AQUEOUS-AMMONIA CARRIER PIPE RENEWAL |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
10% |
|
|
| |
|
DESC: |
|
Replace existing aqueos-ammonia carrier pipe with new stainless steel piping and containment - storage facility to vaporizers. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M8434 |
|
PCUP MODICON CONTROL SYSTEM REPLACEMENT |
|
DENISE STRIPLING |
|
476-3578 |
|
|
|
|
|
40% |
|
|
| |
|
DESC: |
|
Replace the Modicon control system with Ovation Distribution Control System - Install conduit and pull control wire from each motor control center in the PCUP to a single centrally locatied cabinet, connect to existing Ovation dta control system, programm |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M9422 |
|
PCUP-FIRE ALARM REPLACEMENT |
|
FRANK FASANO |
|
476-8270 |
|
|
|
|
|
0% |
|
|
| |
|
DESC: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|