Project |
|
Project Name |
|
Project Manager |
|
Phone |
|
Start |
|
End |
|
% Complete |
|
|
 |
| |
|
HEALTH SCIENCES INSTRUCTION |
|
|
 |
| |
|
M7410C |
|
HSIR INDUSTRIAL HOT WATER SYSTEM RENEWAL |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
25% |
|
|
| |
|
DESC: |
|
Demolish and scrap two (2) failing 350-gallon industrial hot water (IHW) storage tanks located in the HSIR 2nd level machine room. Design, furnish all materials, and construct a new IHW supply system using a single on-demand series water heating system i |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M7411A |
|
HSIR UTILITY TUNNEL MOTOR CONTROL CENTER EMERGENCY ELECTR PANEL REPLACEMENT |
|
JULIE GALLIVAN |
|
476-2080 |
|
04/01/09 |
|
|
|
100% |
|
|
| |
|
DESC: |
|
Replacement of the HSIR MCC Emergency Electrical Panel. Priority #8 on the 2006-2007 Deferred Maintenance List. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M7412A |
|
HSIR FIRE ALARM SYSTEM RENEWAL |
|
FRANK FASANO |
|
476-8270 |
|
12/10/09 |
|
|
|
100% |
|
|
| |
|
DESC: |
|
Upgrading HSIR fire alrarm system: head-end and field panels; system renewal |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M8402C |
|
HSIR BUILDINGS ELEVATOR LOBBY AREA REPAIR PROJECT |
|
PATTI MITCHELL |
|
514-4337 |
|
12/01/09 |
|
|
|
0% |
|
|
| |
|
DESC: |
|
Repair and refinish public corridors ceilings, walls and flooring in the HSIR, MSB & Clinical Sciences buildings to as well as some misc item requested from FM. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M8417 |
|
HSIR SEISMIC STUDY |
|
GARY NELSON |
|
476-6829 |
|
|
|
|
|
20% |
|
|
| |
|
DESC: |
|
Seismic Analysis of HSIR Towers. |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M8450B |
|
HSIR-WEST STAIRWELL LIGHT FIXTURE REPLACEMENT |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
95% |
|
|
| |
|
DESC: |
|
Demolish existing fixtures in stairwells. Install ceiling/wall-mounted Lamar model VO-2-32-E8-U-2C-EM (or equal, no known equal) bi-level stairwell fixtures equipped with integral occupancy sensors. work to be performed in-house |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M8450C |
|
HSIR EAST STAIRWELL LIGHT FIXTURE REPLACEMENT |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
95% |
|
|
| |
|
DESC: |
|
Demolish existing fixtures in stairwells. Install ceiling/wall-mounted Lamar model VO-2-32-E8-U-2C-EM (or equal, no known equal) bi-level stairwell fixtures equipped with integral occupancy sensors. work to be performed in-house |
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
M9428 |
|
HSIR FAN & DAMPER REPLACEMENTS |
|
DAN KRASNOW |
|
476-6822 |
|
|
|
|
|
0% |
|
|
| |
|
DESC: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|